top of page

Branton Tanks

2024

Kier

Bartec Engineering Services Ltd recently completed the fabrication of two large stainless steel splitter tanks for Branton Sewage Treatment Works. These tanks are equipped with adjustable weirs to control water levels effectively, ensuring precise flow distribution across the treatment channels. The design accommodates the existing structural steel at the site, enhancing integration and functionality.

Bartec Engineering Services Ltd

Established 1993​

Unit E2 & E3, Fenton Trade Park, Dewsbury Rd, Fenton, Stoke-on-Trent ST4 2TE, UK

©2021 Bartec Engineering Services Ltd

​

NICEIC - 043021-000

bottom of page