Tupton
Electrical installation at Tupton WwTW including cable supply, containment, terminations, and enabling works under Tilbury Douglas
Bartec was engaged by Tilbury Douglas to deliver the full electrical installation package at Tupton Wastewater Treatment Works.
Our scope included the supply and installation of all electrical cabling, containment systems, instrumentation, and accessories across both power and control systems. Bartec also carried out temporary enabling works to support safe and efficient delivery.
Works included the installation of cable ladder and tray systems, connection to various MCC panels and control units, and the termination of all field wiring to motors, junction boxes, and instrumentation. Signal and fibre optic cabling were installed and routed through dedicated containment, with all works completed to meet site specifications and IET regulations.
This project demonstrates Bartec’s capability to deliver comprehensive electrical installation packages on live utility sites under Tier 1 contractors, while maintaining a strong focus on safety, quality, and programme performance.